Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts

8.19.2014

Fast, Cheap, or Quality ... Pick Two!

"Quality means doing it right when no one is looking."
- Henry Ford
 
 "Quality is never an accident. It is always the result of intelligent effort."
- John Ruskin
 
I have spent the last couple of months utilizing one week’s worth of vacation and an abundant amount of my after work hours and weekend time building a deck at our house. For a number of reasons it has taken me a lot longer than I originally anticipated.   A.   LOT.   LONGER.


There is an old adage in the design and construction industry stating one can have a project done “Fast, Cheap, or Quality…. Pick Two!” Whether you are web designer, contractor, architectural designer, or a husband, in order to build something one really must know which two of these are the most important parameters. Or in other words, which one are you willing to give up?

Quality + Fast = Expensive
This option means the hired contractor will postpone everything, cancel all other appointments, work 24/7 to get the job done. Quality is still paramount and if something goes amiss then a professional fixes it and makes it right. However, the deadline is critical to this scenario, too, and it comes with a cost. The higher price trumps everything else. That is why it is expensive. In the case of our deck, this would have been a professional deck builder or contractor, not me. We could have paid for a contractor and a crew to build it in a week, easy. But labor is not cheap and the contractor mark up on materials isn’t either. Quality + Fast = Expensive

Quality + Cheap = Slow
This option assures quality is not compromised, either. And since quality is paramount one can’t just go cheap on materials. So, in order for it to be cheap one must have cheap labor or no pressing deadline! One works on it when there is spare time. Paying attention to details is important and that can’t be rushed. In the case of our deck, it is just me and my wife. We are free. My vacation time was paid for and I could give the deck project the attention it deserved for a week. But, I’m not a professional. I’m not practiced in the art of speed. I measure twice, sometimes thrice, cut once. Quality + Cheap = Slow

Fast + Cheap = Inferior
This option means one really doesn’t care about the quality. The priorities are to just get it done so that it doesn’t cost a lot of labor and time. Cutting corners is acceptable. Quality is not important. In the case of our deck, this was not an option. Not at my house! Fast + Cheap = Inferior

As of this post, the project is nearing a 90% completion. The deck boards are all in. We can walk on it. The railing and trellis parts have yet to be finished. Plus, we need to put the second coat of stain on it again. But, it feels almost complete. We should have most of the remaining 10% done in the next few weekends, depending on our schedules, of course. The only thing I’m in a hurry for is that sense of accomplishment. I’m not there yet.

A side note:  With all the hours working on the project, I spent some quality time within my own head. I came to the conclusion that there IS indeed a way one can get all three… Fast, Cheap, AND Quality! One needs to be Amish.

Amish Quality = Experienced craftsmen
Amish Cheap = Tons of free, quality labor
Amish Fast = They can build a barn in a weekend

 

 

1.05.2011

Maybe This Year, Then

Maybe this year,

The economy completely recovers.
The $300 I loaned out is returned (after two years).
The go-ahead for that next big project is granted.
Family life stabilizes.
The kids turn into adventurous eaters.
Technology mastery is achieved.
The commute becomes milder.
Leisure time is prevalent.
Gas prices drop while the mpg triples.
The housing market normalizes.
Global warming reverses.

Then, I can,

Paint and draw.
Write and blog.
Discover new music, live music.
Read.
Garden and grow things.
Build and construct.
Travel and explore.
Cook new things.

The point is none of the Maybes are likely to happen. So, why wait on the stuff I really want make. Remember Rule number Six.

11.17.2009

It's Hamma' Time

The other day a friend of mine asked me for advice regarding their pending separation and, ultimately, divorce. More specifically, he wanted to know how I survived it what with all the highly emotional, legal, and financial issues.

That is a loaded question. I understood his trepidation completely. I had the same fears and wanted a ton of answers to questions I didn't even know how to ask.

First, I’m not sure my circumstances are over enough to where my survival can even be counted in the category of “been there, done that”. There are still lingering, almost daily issues. So, I prefaced my comments in the conversation that I didn’t have an appropriate answer. I’m still a work in progress.

Secondly, and more importantly, I’m incredibly biased by own understandings, strengths, and inadequacies. I don’t have a well rounded experience in divorce (thank goodness).

But that is not what my friend wanted to hear. He wanted me to tell him what to do. And that got me thinking.

I’ve been doing some minor construction projects lately and I have construction on the brain. So, I easily went right to the following analogy. For a person comfortable with a hammer, every problem looks like a nail. Got a problem? No big deal, use my divorce-hammer. Bang away at it and your problem can be solved with my hammer. That'll fix it.

At the architecture firm with which I am employed, I’ve been using the same marketing hammer for nine years to some moderate success. Those who have found chiropractors for back pain issues sing the praises of the adjustment hammer, while acupuncturists use that needle-nosed hammer. Recovering alcoholics view the world with their AA hammer, while others find solace in the corner bar...Hammered. Conservatives swing their Rush Limbaugh hammer while Liberals hit their nails with an Olbermann hammer made for lefties. Nutritionists say my cholesterol issues are diet related and should be fixed with a low-fat/whole grain hammer while my doctor fixes me up with the Lipitor hammer.

All of those hammers hit the nail on the head.

I am positive there are studies upon studies that show the biases all around. And I guess that if you truly want to nail it, one should look at the problems in a different way. Take it as an opportunity to find the best solution, not one based on bias. My way is not the right way. And neither is yours all the time, either.

So, my advice to a friend during a very difficult time was to simply be the best person possible. Use whatever tools are available to stay secure, as well as emotionally and financially centered. Be creative. The rest is a work in progress anyway. In fact, divorce and the life after it is a complex construction project in multiple phases. One might need more than a hammer.

Besides, it is fun to wield the electric drill every now and then. Demolition with a saws-all is always a good time. And there is always duct tape for emergencies. More to the point and on a personal note, I've learned to improvise as I lost my favorite hammer in my divorce.